ITAC Assessment: UD0620
ITAC logo
ITAC Assessment: UD0620
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Printed circuit boards
NAICS
n/a
SIC 3672: Printed Circuit Boards
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 86,000
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $134,587 6,094,600
kWh
Electricity Demand $159,714 11,400
kW-mo/yr
Natural Gas $59,493 10,220
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,465 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,444

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 3.5145: Recover and reuse spent acid baths $42,596 $85,000 - - - - $26,796
-
gal
$11,550
-
lb
$4,250
02 2.2437: Recover waste heat from equipment $6,449 $300 $1,172
55,800
kWh
$1,564
-
kW-mo/yr
$3,713
-
MMBtu
- - - -
03 3.5145: Recover and reuse spent acid baths $2,250 - - - - - $2,250
-
gal
- -
04 2.4221: Install compressor air intakes in coolest locations $1,850 - $1,420
67,630
kWh
$430
-
kW-mo/yr
- - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,470 $3,648 $630
30,000
kWh
$840
-
kW-mo/yr
- - - - -
06 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $1,218 - $1,218
58,000
kWh
- - - - - -
07 3.4151: Minimize water usage $876 $750 - - - $876
-
Tgal
- - -
08 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $756 - $756
36,000
kWh
- - - - - -
TOTAL RECOMMENDED $57,465 $89,698 $5,196
247,430
kWh
$2,834
-
kW-mo/yr
$3,713
-
MMBtu
$876
-
Tgal
$29,046
-
gal
$11,550
-
lb
$4,250
TOTAL IMPLEMENTED $3,444 $3,648 $2,604
124,000
kWh
$840
-
kW-mo/yr
- - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs