ITAC Assessment: UD0617
ITAC logo
ITAC Assessment: UD0617
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Forging
NAICS
n/a
SIC 3462: Iron and Steel Forgings
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 65,000
ft2
Annual Production 30,000,000
pieces
Production Hrs. Annual 5,760
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $266,688 12,871,012
kWh
Electricity Demand $566,868 40,404
kW-mo/yr
Natural Gas $49,024 8,430
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $223,989 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $190,594

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 4.621: Use fixtures to reduce machine changeout times $90,000 $111,000 - - - $90,000 - -
02 2.4226: Use / purchase optimum sized compressor $98,016 $60,000 - - $1,044
-
gal
$21,120 $60,000 $15,852
03 3.5112: Reprocess spent oils on site for re-use $20,174 $3,131 - - $20,174
-
gal
- - -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $10,875 - - $10,875
-
kW-mo/yr
- - - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,578 $695 $726
34,560
kWh
$1,852
-
kW-mo/yr
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,273 $260 $532
25,344
kWh
$741
-
kW-mo/yr
- - - -
07 2.7124: Make a practice of turning off lights when not needed $1,073 - $248
11,760
kWh
$825
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $223,989 $175,086 $1,506
71,664
kWh
$14,293
-
kW-mo/yr
$21,218
-
gal
$111,120 $60,000 $15,852
TOTAL IMPLEMENTED $190,594 $171,695 $726
34,560
kWh
$1,852
-
kW-mo/yr
$1,044
-
gal
$111,120 $60,000 $15,852
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs