ITAC Assessment: UD0335
ITAC logo
ITAC Assessment: UD0335
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product CENTRIFUGAL PUMPS
NAICS
n/a
SIC 3561: Pumps and Pumping Equipment
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,092 1,807,151
kWh
Natural Gas $18,837 4,462
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,504 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,504

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.6124: Establish equipment maintenance schedule $802 - $770
4,103
kWh
- $32
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,152 - $1,152
-
kWh
- -
03 2.4239: Eliminate or reduce compressed air usage $3,524 $2,000 $4,279
110,785
kWh
$(-755.0)
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,026 - $1,856
27,257
kWh
- $170
TOTAL RECOMMENDED $7,504 $2,000 $8,057
142,145
kWh
$(-755.0)
-
MMBtu
$202
TOTAL IMPLEMENTED $7,504 $2,000 $8,057
142,145
kWh
$(-755.0)
-
MMBtu
$202
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs