ITAC Assessment: UD0611
ITAC logo
ITAC Assessment: UD0611
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Automotive plastic exterior trims, weather stripping and sea
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 900
Plant Area 258,000
ft2
Annual Production 13,201,144
lb
Production Hrs. Annual 8,400
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $319,400 19,111,958
kWh
Electricity Demand $568,109 40,320
kW-mo/yr
Natural Gas $71,532 13,328
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $389,024 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $83,675

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
01 3.1192: Reduce scrap production $171,908 $100,000 - - - - $5,588
-
lb
- - $166,320
02 4.652: Replace existing equipment with more suitable substitutes $120,000 $95,750 - - - - - - $120,000 -
03 3.4111: Use closed cycle process to minimize waste water production $29,561 $1,200 - - - $29,561
-
Tgal
- - - -
04 2.4224: Upgrade controls on compressors $23,249 $4,000 $13,781
626,612
kWh
$9,468
-
kW-mo/yr
- - - - - -
05 3.4116: Meter recycled water (to reduce sewer charges) $17,705 $3,000 - - - $17,705
-
Tgal
- - - -
06 4.431: Train operators for maximum operating efficiency $12,096 - - - - - - $12,096 - -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,016 - $3,142
142,732
kWh
$2,874
-
kW-mo/yr
- - - - - -
08 2.2437: Recover waste heat from equipment $4,371 $1,000 - - $4,371
-
MMBtu
- - - - -
09 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $2,773 $700 $475
10,258
kWh
- $2,298
-
MMBtu
- - - - -
10 2.4239: Eliminate or reduce compressed air usage $1,345 $500 $702
31,946
kWh
$643
-
kW-mo/yr
- - - - - -
TOTAL RECOMMENDED $389,024 $206,150 $18,100
811,548
kWh
$12,985
-
kW-mo/yr
$6,669
-
MMBtu
$47,266
-
Tgal
$5,588
-
lb
$12,096 $120,000 $166,320
TOTAL IMPLEMENTED $83,675 $9,900 $17,398
779,602
kWh
$12,342
-
kW-mo/yr
$6,669
-
MMBtu
$47,266
-
Tgal
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs