ITAC Assessment: OK0724
ITAC logo
ITAC Assessment: OK0724
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Plastic cups
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area 18,000
ft2
Annual Production 4,000,000,000
pieces
Production Hrs. Annual 8,500
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $83,411 1,434,900
kWh
Natural Gas $482,179 55,802
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $103,557 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.2511: Insulate bare equipment $588 $322 - $588
-
MMBtu
-
02 2.2511: Insulate bare equipment $2,492 $1,975 - $2,492
-
MMBtu
-
03 2.1212: Operate boilers on high fire setting $41,858 $4,100 - $41,858
-
MMBtu
-
04 2.7135: Install occupancy sensors $380 $288 $380
6,528
kWh
- -
05 4.821: Pay bills on time to avoid late fees $13,458 - - - $13,458
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,235 $5,958 $3,235
55,678
kWh
- -
07 2.4322: Use or replace with energy efficient substitutes $7,655 $2,592 $7,655
131,750
kWh
- -
08 2.7221: Lower temperature during the winter season and vice-versa $169 $495 $169
4,893
kWh
- -
09 2.1331: Burn a less expensive grade of fuel $28,864 $61,416 - - $28,864
10 2.4227: Use compressor air filters $2,647 $642 $2,647
45,560
kWh
- -
11 2.4231: Reduce the pressure of compressed air to the minimum required $2,211 $5,963 $2,211
38,046
kWh
- -
TOTAL RECOMMENDED $103,557 $83,751 $16,297
282,455
kWh
$44,938
-
MMBtu
$42,322
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs