Assessment Year | 2000 |
---|---|
Principal Product | Ultrasonic machining of glass and ceramics, metalworking |
NAICS |
n/a
|
SIC | 3699: Electrical Machinery, Equipment, and Supplies, Not Elsewhere |
Sales Range | $10 M to 50M |
# of Employees | 30 |
Plant Area |
13,000
ft2
|
Annual Production | 101,600
pieces
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $26,466 | 971,278 |
kWh
|
$0.027 |
Electricity Demand | $40,859 | 2,904 |
kW-mo/yr
|
$14.07 |
LPG | $10,826 | 1,674 |
MMBtu
|
$6.47 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $38,396 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $22,767 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 3.3125: Use distillation, evaporation to remove contaminants | $10,974 | $10,755 |
$(-146.0)
(-5,275)
kWh
|
- | - |
$5,990
-
gal
|
- | - | $5,130 | |
02 | 2.3134: Shift from daytime to nighttime operation | $8,795 | - | - |
$10,637
-
kW-mo/yr
|
- | - | - | $(-10,200.0) | $8,358 | |
03 | 2.2622: Replace existing chiller with high efficiency model | $4,987 | $20,000 |
$4,238
157,093
kWh
|
$4,354
-
kW-mo/yr
|
$(-3,605.0)
-
MMBtu
|
- | - | - | - | |
04 | 2.4226: Use / purchase optimum sized compressor | $4,956 | $2,500 |
$1,157
55,100
kWh
|
$3,799
-
kW-mo/yr
|
- | - | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,883 | $8,852 |
$1,426
52,755
kWh
|
$1,457
-
kW-mo/yr
|
- | - | - | - | - | |
06 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $2,628 | - | - | - | - | - |
$2,628
-
lb
|
- | - | |
07 | 2.2437: Recover waste heat from equipment | $1,401 | $1,000 | - | - |
$1,401
-
MMBtu
|
- | - | - | - | |
08 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $900 | - | - | - | - | - |
$900
-
lb
|
- | - | |
09 | 2.2427: Use waste heat from hot flue gases to preheat incoming fluids | $872 | $500 | - | - |
$872
-
MMBtu
|
- | - | - | - | |
TOTAL RECOMMENDED | $38,396 | $43,607 |
$6,675
259,673
kWh
|
$20,247
-
kW-mo/yr
|
$(-1,332.0)
-
MMBtu
|
$5,990
-
gal
|
$3,528
-
lb
|
$(-10,200.0) | $13,488 | ||
TOTAL IMPLEMENTED | $22,767 | $23,500 |
$5,395
212,193
kWh
|
$18,790
-
kW-mo/yr
|
$(-2,204.0)
-
MMBtu
|
- |
$2,628
-
lb
|
$(-10,200.0) | $8,358 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs