Assessment Year | 1999 |
---|---|
Principal Product | Dispersions, emulsions, color pigments, thermoset resins |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 140 |
Plant Area |
150,000
ft2
|
Annual Production | 15,000,000
lb
|
Production Hrs. Annual | 5,000
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $124,859 | 2,198,710 |
kWh
|
$0.057 |
Electricity Demand | $99,967 | 6,660 |
kW-mo/yr
|
$15.01 |
Natural Gas | $43,426 | 9,450 |
MMBtu
|
$4.60 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $295,158 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $43,376 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 4.441: Install automatic packing equipment | $250,000 | $325,000 | - | - | - | $250,000 | - | - | |
02 | 4.131: Modify process to reduce material use/cost | $25,726 | $7,500 | - | - | - | - | $1,163 | $24,563 | |
03 | 3.4114: Replace city water with recycled water via cooling tower | $9,050 | $8,000 |
$(-385.0)
(-7,034)
kWh
|
$(-1,891.0)
-
kW-mo/yr
|
$11,326
-
Tgal
|
- | - | - | |
04 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $7,690 | $2,850 |
$2,915
53,048
kWh
|
$4,775
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.6231: Utilize controls to operate equipment only when needed | $1,782 | $2,000 |
$1,782
32,532
kWh
|
- | - | - | - | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $910 | - |
$550
9,965
kWh
|
$360
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $295,158 | $345,350 |
$4,862
88,511
kWh
|
$3,244
-
kW-mo/yr
|
$11,326
-
Tgal
|
$250,000 | $1,163 | $24,563 | ||
TOTAL IMPLEMENTED | $43,376 | $18,350 |
$3,080
55,979
kWh
|
$3,244
-
kW-mo/yr
|
$11,326
-
Tgal
|
- | $1,163 | $24,563 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs