ITAC Assessment: UA0267
ITAC logo
ITAC Assessment: UA0267
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Organic Bread
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $5
M
to 10
M
# of Employees 170
Plant Area 100,000
ft2
Annual Production 47,000,000
units
Production Hrs. Annual 8,736
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $312,109 5,343,000
kWh
Electricity Demand $42,645 9,212
kW-mo/yr
Electricity Fees $42,482 -
Natural Gas $351,471 27,075
MMBtu
TOTAL YEARLY COSTS $748,707
RECOMMENDED SAVINGS* $25,712 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,664

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.3412: Use waste heat to produce steam to drive a steam turbine-generator $13,660 $51,749 $11,001
188,366
kWh
$1,198
-
kW-mo/yr
$1,461
02 2.4231: Reduce the pressure of compressed air to the minimum required $6,033 $1,000 $4,193
71,792
kWh
$1,195
-
kW-mo/yr
$645
03 2.7261: Install timers and/or thermostats $2,954 $1,360 $2,638
45,166
kWh
- $316
04 2.3212: Optimize plant power factor $2,388 $1,682 - - $2,388
05 2.7135: Install occupancy sensors $677 $901 $605
10,353
kWh
- $72
TOTAL RECOMMENDED $25,712 $56,692 $18,437
315,677
kWh
$2,393
-
kW-mo/yr
$4,882
TOTAL IMPLEMENTED $9,664 $3,261 $7,436
127,311
kWh
$1,195
-
kW-mo/yr
$1,033
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs