ITAC Assessment: UD0571
ITAC logo
ITAC Assessment: UD0571
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product ferrous alloy and aluminum castings
NAICS
n/a
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 185,000
ft2
Annual Production 3,300,000
lb
Production Hrs. Annual 6,600
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $196,657 7,963,072
kWh
Electricity Demand $269,975 19,188
kW-mo/yr
Natural Gas $237,129 67,823
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $394,082 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $254,426

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 3.5221: Recycle casting sand $227,844 $135,000 - - - $233,250
-
lb
- $(-5,406.0) -
02 2.8114: Change rate schedules or other changes in utility service $67,000 $24,000 - - - - - $67,000 -
03 4.652: Replace existing equipment with more suitable substitutes $27,700 $40,000 - - - $300
-
lb
$27,400 - -
04 4.652: Replace existing equipment with more suitable substitutes $21,000 $64,000 - - - - $20,100 $900 -
05 3.8211: Convert to aqueous cleaning system $18,667 - - - $18,667
-
gal
- - - -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $15,800 - - - - - $(-2,000.0) $17,800 -
07 2.3511: Use plant owned transformers or lease transformers $9,000 $24,000 - - - - - $9,000 -
08 2.4226: Use / purchase optimum sized compressor $5,582 - $5,282
251,759
kWh
$2,100
-
kW-mo/yr
- - $(-1,800.0) - -
09 3.1191: Change procedures / equipment / operating conditions $1,489 - - - - - - - $1,489
TOTAL RECOMMENDED $394,082 $287,000 $5,282
251,759
kWh
$2,100
-
kW-mo/yr
$18,667
-
gal
$233,550
-
lb
$43,700 $89,294 $1,489
TOTAL IMPLEMENTED $254,426 $199,000 $5,282
251,759
kWh
$2,100
-
kW-mo/yr
- $233,250
-
lb
$18,300 $(-4,506.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings