ITAC Assessment: UD0567
ITAC logo
ITAC Assessment: UD0567
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product EPS food packaging
NAICS
n/a
SIC 3086: Plastics Foam Products
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 180,000
ft2
Annual Production 11,000,000
lb
Production Hrs. Annual 8,568
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $288,343 12,697,245
kWh
Electricity Demand $285,002 20,256
kW-mo/yr
Natural Gas $2,653 521
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,718,025 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,545,353

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings Increase in Production Savings
01 4.441: Install automatic packing equipment $1,501,920 $1,075,000 - - $1,260,000 - - $241,920
02 4.131: Modify process to reduce material use/cost $1,154,672 $1,100,000 - - - - $1,154,672 -
03 4.652: Replace existing equipment with more suitable substitutes $32,400 $90,000 - - $5,400 - $27,000 -
04 2.3511: Use plant owned transformers or lease transformers $18,000 $30,000 - - - $18,000 - -
05 2.4224: Upgrade controls on compressors $7,855 $2,508 $4,409
191,676
kWh
$3,446
-
kW-mo/yr
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,178 $9,800 $1,637
77,960
kWh
$1,541
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $2,718,025 $2,307,308 $6,046
269,636
kWh
$4,987
-
kW-mo/yr
$1,265,400 $18,000 $1,181,672 $241,920
TOTAL IMPLEMENTED $1,545,353 $1,177,308 $6,046
269,636
kWh
$4,987
-
kW-mo/yr
$1,265,400 - $27,000 $241,920
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs