Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Furniture
NAICS 337124: Metal Household Furniture Manufacturing
SIC 2514: Metal Household Furniture
Sales Range $1
M
to 5
M
# of Employees 240
Plant Area 200,645
ft2
Annual Production 106,000
pieces
Production Hrs. Annual 2,168
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,346 1,161,152
kWh
Electricity Demand $88,061 4,622
kW-mo/yr
Electricity Fees $9,797 -
Natural Gas $67,781 10,750
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,746 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,638

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7232: Replace existing hvac unit with high efficiency model $18,026 $61,400 $14,092
189,408
kWh
$3,934
-
kW-mo/yr
-
02 2.2511: Insulate bare equipment $7,108 $21,254 - - $7,108
-
MMBtu
03 2.2414: Use waste heat from hot flue gases to preheat $5,486 $2,845 - - $5,486
-
MMBtu
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,633 $2,600 $2,633
35,390
kWh
- -
05 2.7447: Install vinyl strip / high speed / air curtain doors $1,563 $3,243 $(-395.0)
(-5,306)
kWh
$(-512.0)
-
kW-mo/yr
$2,470
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,147 $500 $670
8,997
kWh
$477
-
kW-mo/yr
-
07 2.3132: Recharge batteries on during off-peak demand periods $783 $500 - $783
-
kW-mo/yr
-
TOTAL RECOMMENDED $36,746 $92,342 $17,000
228,489
kWh
$4,682
-
kW-mo/yr
$15,064
-
MMBtu
TOTAL IMPLEMENTED $29,638 $71,088 $17,000
228,489
kWh
$4,682
-
kW-mo/yr
$7,956
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs