| Assessment Year | 1998 |
|---|---|
| Principal Product | Botts, nuts, screws, rivets and washers |
| NAICS |
n/a
|
| SIC | 3452: Bolts, Nuts, Screws, Rivets, and Washers |
| Sales Range | $5 M to 10M |
| # of Employees | 57 |
| Plant Area |
21,000
ft2
|
| Annual Production | 750,000,000
pieces
|
| Production Hrs. Annual | 4,500
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $33,783 | 1,550,117 |
kWh
|
$0.022 |
| Electricity Demand | $63,612 | 4,128 |
kW-mo/yr
|
$15.41 |
| Natural Gas | $9,748 | 1,628 |
MMBtu
|
$5.99 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $235,436 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,618 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 4.122: Develop standard procedures to improve internal yields | $199,687 | - | - | - | - | - |
$115,312
-
lb
|
$56,250 | $28,125 | - | |
| 02 | 4.652: Replace existing equipment with more suitable substitutes | $9,000 | $12,000 | - | - | - | - | - | $9,000 | - | - | |
| 03 | 3.3128: Utilize other methods to remove contaminants | $18,478 | $1,800 | - | - | - |
$2,812
-
gal
|
- | $10,125 | - | $5,541 | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,681 | $7,118 |
$1,217
55,979
kWh
|
$2,464
-
kW-mo/yr
|
- | - | - | - | - | - | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,972 | - |
$683
31,360
kWh
|
$1,289
-
kW-mo/yr
|
- | - | - | - | - | - | |
| 06 | 2.4226: Use / purchase optimum sized compressor | $1,132 | $600 |
$392
17,878
kWh
|
$740
-
kW-mo/yr
|
- | - | - | - | - | - | |
| 07 | 2.2437: Recover waste heat from equipment | $1,486 | $2,000 |
$315
14,361
kWh
|
- |
$1,171
-
MMBtu
|
- | - | - | - | - | |
| TOTAL RECOMMENDED | $235,436 | $23,518 |
$2,607
119,578
kWh
|
$4,493
-
kW-mo/yr
|
$1,171
-
MMBtu
|
$2,812
-
gal
|
$115,312
-
lb
|
$75,375 | $28,125 | $5,541 | ||
| TOTAL IMPLEMENTED | $2,618 | $2,600 |
$707
32,239
kWh
|
$740
-
kW-mo/yr
|
$1,171
-
MMBtu
|
- | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs