ITAC Assessment: UD0546
ITAC logo
ITAC Assessment: UD0546
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Precast and prestressed concrete products
NAICS
n/a
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 45,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,050
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,433 1,209,261
kWh
Electricity Demand $66,016 4,692
kW-mo/yr
Natural Gas $56,926 10,516
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,337 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,332

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.8113: Purchase gas directly from a contract gas supplier $4,349 - - - - $4,349 -
02 2.4226: Use / purchase optimum sized compressor $2,580 - $1,737
66,823
kWh
- - $843 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,450 $6,900 $588
22,567
kWh
$1,675
-
kW-mo/yr
- $187 -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,403 $4,000 $876
33,705
kWh
$2,246
-
kW-mo/yr
$(-719.0)
-
MMBtu
- -
05 3.1192: Reduce scrap production $1,933 - - - - - $1,933
06 2.2437: Recover waste heat from equipment $622 $600 - - $622
-
MMBtu
- -
TOTAL RECOMMENDED $14,337 $11,500 $3,201
123,095
kWh
$3,921
-
kW-mo/yr
$(-97.0)
-
MMBtu
$5,379 $1,933
TOTAL IMPLEMENTED $9,332 $4,000 $2,613
100,528
kWh
$2,246
-
kW-mo/yr
$(-719.0)
-
MMBtu
$5,192 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs