Assessment Year | 1998 |
---|---|
Principal Product | Precast and prestressed concrete products |
NAICS |
n/a
|
SIC | 3272: Concrete Products, Except Block and Brick |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
45,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 4,050
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $31,433 | 1,209,261 |
kWh
|
$0.026 |
Electricity Demand | $66,016 | 4,692 |
kW-mo/yr
|
$14.07 |
Natural Gas | $56,926 | 10,516 |
MMBtu
|
$5.41 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $14,337 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,332 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.8113: Purchase gas directly from a contract gas supplier | $4,349 | - | - | - | - | $4,349 | - | |
02 | 2.4226: Use / purchase optimum sized compressor | $2,580 | - |
$1,737
66,823
kWh
|
- | - | $843 | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,450 | $6,900 |
$588
22,567
kWh
|
$1,675
-
kW-mo/yr
|
- | $187 | - | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $2,403 | $4,000 |
$876
33,705
kWh
|
$2,246
-
kW-mo/yr
|
$(-719.0)
-
MMBtu
|
- | - | |
05 | 3.1192: Reduce scrap production | $1,933 | - | - | - | - | - | $1,933 | |
06 | 2.2437: Recover waste heat from equipment | $622 | $600 | - | - |
$622
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $14,337 | $11,500 |
$3,201
123,095
kWh
|
$3,921
-
kW-mo/yr
|
$(-97.0)
-
MMBtu
|
$5,379 | $1,933 | ||
TOTAL IMPLEMENTED | $9,332 | $4,000 |
$2,613
100,528
kWh
|
$2,246
-
kW-mo/yr
|
$(-719.0)
-
MMBtu
|
$5,192 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs