| Assessment Year | 1998 |
|---|---|
| Principal Product | Precast and prestressed concrete products |
| NAICS |
n/a
|
| SIC | 3272: Concrete Products, Except Block and Brick |
| Sales Range | $10 M to 50M |
| # of Employees | 80 |
| Plant Area |
45,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 4,050
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $31,433 | 1,209,261 |
kWh
|
$0.026 |
| Electricity Demand | $66,016 | 4,692 |
kW-mo/yr
|
$14.07 |
| Natural Gas | $56,926 | 10,516 |
MMBtu
|
$5.41 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $14,337 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,332 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.8113: Purchase gas directly from a contract gas supplier | $4,349 | - | - | - | - | $4,349 | - | |
| 02 | 2.4226: Use / purchase optimum sized compressor | $2,580 | - |
$1,737
66,823
kWh
|
- | - | $843 | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,450 | $6,900 |
$588
22,567
kWh
|
$1,675
-
kW-mo/yr
|
- | $187 | - | |
| 04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $2,403 | $4,000 |
$876
33,705
kWh
|
$2,246
-
kW-mo/yr
|
$(-719.0)
-
MMBtu
|
- | - | |
| 05 | 3.1192: Reduce scrap production | $1,933 | - | - | - | - | - | $1,933 | |
| 06 | 2.2437: Recover waste heat from equipment | $622 | $600 | - | - |
$622
-
MMBtu
|
- | - | |
| TOTAL RECOMMENDED | $14,337 | $11,500 |
$3,201
123,095
kWh
|
$3,921
-
kW-mo/yr
|
$(-97.0)
-
MMBtu
|
$5,379 | $1,933 | ||
| TOTAL IMPLEMENTED | $9,332 | $4,000 |
$2,613
100,528
kWh
|
$2,246
-
kW-mo/yr
|
$(-719.0)
-
MMBtu
|
$5,192 | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs