| Assessment Year | 1997 |
|---|---|
| Principal Product | Cotton Mops |
| NAICS |
n/a
|
| SIC | 2392: House furnishing, Except Curtains and Draperies |
| Sales Range | $5 M to 10M |
| # of Employees | 80 |
| Plant Area |
40,600
ft2
|
| Annual Production | 1,500,000
pieces
|
| Production Hrs. Annual | 4,250
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $12,754 | 485,053 |
kWh
|
$0.026 |
| Electricity Demand | $18,741 | 1,332 |
kW-mo/yr
|
$14.07 |
| Natural Gas | $10,775 | 1,820 |
MMBtu
|
$5.92 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $7,247 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,247 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,192 | $300 |
$1,505
57,151
kWh
|
$687
-
kW-mo/yr
|
- | - | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $611 | $2,000 | - | - |
$611
-
MMBtu
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,444 | $12,327 |
$1,360
51,583
kWh
|
$2,180
-
kW-mo/yr
|
- | $904 | |
| TOTAL RECOMMENDED | $7,247 | $14,627 |
$2,865
108,734
kWh
|
$2,867
-
kW-mo/yr
|
$611
-
MMBtu
|
$904 | ||
| TOTAL IMPLEMENTED | $7,247 | $14,627 |
$2,865
108,734
kWh
|
$2,867
-
kW-mo/yr
|
$611
-
MMBtu
|
$904 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs