ITAC Assessment: UD0531
ITAC logo
ITAC Assessment: UD0531
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Cotton Mops
NAICS
n/a
SIC 2392: House furnishing, Except Curtains and Draperies
Sales Range $5
M
to 10
M
# of Employees 80
Plant Area 40,600
ft2
Annual Production 1,500,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $12,754 485,053
kWh
Electricity Demand $18,741 1,332
kW-mo/yr
Natural Gas $10,775 1,820
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,247 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,247

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,192 $300 $1,505
57,151
kWh
$687
-
kW-mo/yr
- -
02 2.4221: Install compressor air intakes in coolest locations $611 $2,000 - - $611
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,444 $12,327 $1,360
51,583
kWh
$2,180
-
kW-mo/yr
- $904
TOTAL RECOMMENDED $7,247 $14,627 $2,865
108,734
kWh
$2,867
-
kW-mo/yr
$611
-
MMBtu
$904
TOTAL IMPLEMENTED $7,247 $14,627 $2,865
108,734
kWh
$2,867
-
kW-mo/yr
$611
-
MMBtu
$904
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs