| Assessment Year | 1997 |
|---|---|
| Principal Product | Graphite heat exchangers |
| NAICS |
n/a
|
| SIC | 3443: Fabricated Plate Work (Boiler Shops) |
| Sales Range | $10 M to 50M |
| # of Employees | 43 |
| Plant Area |
42,000
ft2
|
| Annual Production | 0
pieces
|
| Production Hrs. Annual | 2,000
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $32,116 | 783,412 |
kWh
|
$0.041 |
| Electricity Demand | $26,519 | 2,340 |
kW-mo/yr
|
$11.33 |
| Natural Gas | $29,063 | 4,255 |
MMBtu
|
$6.83 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $15,411 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,177 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,177 | $200 |
$7,569
137,749
kWh
|
$528
-
kW-mo/yr
|
- | - | $1,080 | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,800 | $3,259 |
$1,370
33,411
kWh
|
$430
-
kW-mo/yr
|
- | - | - | |
| 03 | 3.4111: Use closed cycle process to minimize waste water production | $1,740 | $3,000 | - | - | - |
$1,740
-
Tgal
|
- | |
| 04 | 2.7442: Keep doors and windows shut when not on use | $2,694 | $200 | - | - |
$2,694
-
MMBtu
|
- | - | |
| TOTAL RECOMMENDED | $15,411 | $6,659 |
$8,939
171,160
kWh
|
$958
-
kW-mo/yr
|
$2,694
-
MMBtu
|
$1,740
-
Tgal
|
$1,080 | ||
| TOTAL IMPLEMENTED | $9,177 | $200 |
$7,569
137,749
kWh
|
$528
-
kW-mo/yr
|
- | - | $1,080 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs