ITAC Assessment: UD0524
ITAC logo
ITAC Assessment: UD0524
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Commercial Printing
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $5
M
to 10
M
# of Employees 88
Plant Area 82,000
ft2
Annual Production 0
thousand feet
Production Hrs. Annual 6,800
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,427 2,555,979
kWh
Electricity Demand $69,581 5,988
kW-mo/yr
Natural Gas $22,979 3,993
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,925 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,357

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.1135: Repair furnaces and oven doors so that they seal efficiently $1,145 - - - $1,595
-
MMBtu
$(-450.0) -
02 2.2515: Use optimum thickness insulation $1,914 $9,400 $128
5,862
kWh
- $1,786
-
MMBtu
- -
03 2.4221: Install compressor air intakes in coolest locations $9,568 - $3,129
146,835
kWh
$3,012
-
kW-mo/yr
$2,294
-
MMBtu
- $1,133
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,898 $16,158 $2,737
130,422
kWh
$2,161
-
kW-mo/yr
- - -
05 2.3311: Replace dc equipment with ac equipment $5,400 $22,500 - - - $5,400 -
TOTAL RECOMMENDED $22,925 $48,058 $5,994
283,119
kWh
$5,173
-
kW-mo/yr
$5,675
-
MMBtu
$4,950 $1,133
TOTAL IMPLEMENTED $13,357 $48,058 $2,865
136,284
kWh
$2,161
-
kW-mo/yr
$3,381
-
MMBtu
$4,950 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs