Assessment Year | 1997 |
---|---|
Principal Product | Commercial Printing |
NAICS |
n/a
|
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $5 M to 10M |
# of Employees | 88 |
Plant Area |
82,000
ft2
|
Annual Production | 0
thousand feet
|
Production Hrs. Annual | 6,800
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $54,427 | 2,555,979 |
kWh
|
$0.021 |
Electricity Demand | $69,581 | 5,988 |
kW-mo/yr
|
$11.62 |
Natural Gas | $22,979 | 3,993 |
MMBtu
|
$5.75 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $22,925 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,357 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.1135: Repair furnaces and oven doors so that they seal efficiently | $1,145 | - | - | - |
$1,595
-
MMBtu
|
$(-450.0) | - | |
02 | 2.2515: Use optimum thickness insulation | $1,914 | $9,400 |
$128
5,862
kWh
|
- |
$1,786
-
MMBtu
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $9,568 | - |
$3,129
146,835
kWh
|
$3,012
-
kW-mo/yr
|
$2,294
-
MMBtu
|
- | $1,133 | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,898 | $16,158 |
$2,737
130,422
kWh
|
$2,161
-
kW-mo/yr
|
- | - | - | |
05 | 2.3311: Replace dc equipment with ac equipment | $5,400 | $22,500 | - | - | - | $5,400 | - | |
TOTAL RECOMMENDED | $22,925 | $48,058 |
$5,994
283,119
kWh
|
$5,173
-
kW-mo/yr
|
$5,675
-
MMBtu
|
$4,950 | $1,133 | ||
TOTAL IMPLEMENTED | $13,357 | $48,058 |
$2,865
136,284
kWh
|
$2,161
-
kW-mo/yr
|
$3,381
-
MMBtu
|
$4,950 | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs