ITAC Assessment: AS0072
ITAC logo
ITAC Assessment: AS0072
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product PLASTIC INJECTION MOLDS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 350
Plant Area
n/a
Annual Production 50,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,444,676 23,461,900
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,384 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.2614: Use cooling tower or economizer to replace chiller cooling $9,429 $20,000 $9,429
152,989
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,357 $6,496 $1,357
21,981
kWh
-
03 2.4133: Use most efficient type of electric motors $4,399 $42,903 $4,399
71,512
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,586 - $5,586
90,856
kWh
-
05 2.6212: Turn off equipment during breaks, reduce operating time $9,491 $291 $9,491
154,162
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,155 $14,207 $3,155
51,290
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,653 $342 $2,903
47,186
kWh
$(-250.0)
08 2.2511: Insulate bare equipment $12,667 $11,960 $12,667
205,744
kWh
-
09 2.4322: Use or replace with energy efficient substitutes $4,161 $10,760 $4,161
67,702
kWh
-
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $486 $100 $486
7,913
kWh
-
TOTAL RECOMMENDED $53,384 $107,059 $53,634
871,335
kWh
$(-250.0)
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs