Assessment Year | 1992 |
---|---|
Principal Product | PLASTIC INJECTION MOLDS |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 350 |
Plant Area |
n/a
|
Annual Production | 50,000,000
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,444,676 | 23,461,900 |
kWh
|
$0.062 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $53,384 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|
01 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $9,429 | $20,000 |
$9,429
152,989
kWh
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,357 | $6,496 |
$1,357
21,981
kWh
|
- | |
03 | 2.4133: Use most efficient type of electric motors | $4,399 | $42,903 |
$4,399
71,512
kWh
|
- | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,586 | - |
$5,586
90,856
kWh
|
- | |
05 | 2.6212: Turn off equipment during breaks, reduce operating time | $9,491 | $291 |
$9,491
154,162
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,155 | $14,207 |
$3,155
51,290
kWh
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,653 | $342 |
$2,903
47,186
kWh
|
$(-250.0) | |
08 | 2.2511: Insulate bare equipment | $12,667 | $11,960 |
$12,667
205,744
kWh
|
- | |
09 | 2.4322: Use or replace with energy efficient substitutes | $4,161 | $10,760 |
$4,161
67,702
kWh
|
- | |
10 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $486 | $100 |
$486
7,913
kWh
|
- | |
TOTAL RECOMMENDED | $53,384 | $107,059 |
$53,634
871,335
kWh
|
$(-250.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs