| Assessment Year | 1997 |
|---|---|
| Principal Product | Fabricated Rubber Products |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 200 |
| Plant Area |
140,000
ft2
|
| Annual Production | 0
thousand feet
|
| Production Hrs. Annual | 3,000
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $107,050 | 5,027,257 |
kWh
|
$0.021 |
| Electricity Demand | $141,254 | 13,440 |
kW-mo/yr
|
$10.51 |
| Natural Gas | $268,483 | 70,273 |
MMBtu
|
$3.82 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $95,607 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $29,006 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,126 | $6,975 |
$1,571
73,857
kWh
|
$1,555
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $647 | $2,000 |
$408
19,050
kWh
|
$239
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,104 | $16,862 |
$1,636
76,788
kWh
|
$1,468
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.4226: Use / purchase optimum sized compressor | $33,190 | $7,500 |
$4,481
210,434
kWh
|
$7,819
-
kW-mo/yr
|
- |
$20,890
-
Tgal
|
- | |
| 05 | 3.4156: Use flow control valves on equipment to optimize water use | $22,129 | $4,000 | - | - | - |
$22,129
-
Tgal
|
- | |
| 06 | 3.4114: Replace city water with recycled water via cooling tower | $18,194 | $10,000 |
$(-180.0)
(-8,499)
kWh
|
$(-164.0)
-
kW-mo/yr
|
- |
$19,038
-
Tgal
|
$(-500.0) | |
| 07 | 3.4151: Minimize water usage | $3,644 | $3,500 |
$(-4.0)
(-293)
kWh
|
- | - |
$3,648
-
Tgal
|
- | |
| 08 | 2.1331: Burn a less expensive grade of fuel | $11,573 | $5,000 |
$4,568
214,537
kWh
|
$10,481
-
kW-mo/yr
|
$(-3,476.0)
-
MMBtu
|
- | - | |
| TOTAL RECOMMENDED | $95,607 | $55,837 |
$12,480
585,874
kWh
|
$21,398
-
kW-mo/yr
|
$(-3,476.0)
-
MMBtu
|
$65,705
-
Tgal
|
$(-500.0) | ||
| TOTAL IMPLEMENTED | $29,006 | $29,837 |
$3,615
169,695
kWh
|
$3,262
-
kW-mo/yr
|
- |
$22,129
-
Tgal
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs