ITAC Assessment: UD0522
ITAC logo
ITAC Assessment: UD0522
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Fabricated Rubber Products
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 140,000
ft2
Annual Production 0
thousand feet
Production Hrs. Annual 3,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $107,050 5,027,257
kWh
Electricity Demand $141,254 13,440
kW-mo/yr
Natural Gas $268,483 70,273
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $95,607 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,006

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,126 $6,975 $1,571
73,857
kWh
$1,555
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $647 $2,000 $408
19,050
kWh
$239
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,104 $16,862 $1,636
76,788
kWh
$1,468
-
kW-mo/yr
- - -
04 2.4226: Use / purchase optimum sized compressor $33,190 $7,500 $4,481
210,434
kWh
$7,819
-
kW-mo/yr
- $20,890
-
Tgal
-
05 3.4156: Use flow control valves on equipment to optimize water use $22,129 $4,000 - - - $22,129
-
Tgal
-
06 3.4114: Replace city water with recycled water via cooling tower $18,194 $10,000 $(-180.0)
(-8,499)
kWh
$(-164.0)
-
kW-mo/yr
- $19,038
-
Tgal
$(-500.0)
07 3.4151: Minimize water usage $3,644 $3,500 $(-4.0)
(-293)
kWh
- - $3,648
-
Tgal
-
08 2.1331: Burn a less expensive grade of fuel $11,573 $5,000 $4,568
214,537
kWh
$10,481
-
kW-mo/yr
$(-3,476.0)
-
MMBtu
- -
TOTAL RECOMMENDED $95,607 $55,837 $12,480
585,874
kWh
$21,398
-
kW-mo/yr
$(-3,476.0)
-
MMBtu
$65,705
-
Tgal
$(-500.0)
TOTAL IMPLEMENTED $29,006 $29,837 $3,615
169,695
kWh
$3,262
-
kW-mo/yr
- $22,129
-
Tgal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs