Assessment Year | 1997 |
---|---|
Principal Product | Surface Mount Capacitors |
NAICS |
n/a
|
SIC | 3675: Electronic Capacitors |
Sales Range | $10 M to 50M |
# of Employees | 275 |
Plant Area |
73,000
ft2
|
Annual Production | 6,500
pieces
|
Production Hrs. Annual | 6,250
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $392,954 | 5,822,099 |
kWh
|
$0.067 |
Electricity Demand | $93,585 | 11,358 |
kW-mo/yr
|
$8.24 |
Electricity Fees | $12,447 | - |
|
- |
LPG | $267 | 9 |
MMBtu
|
$29.67 |
Fuel Oil #2 | $64,384 | 12,601 |
MMBtu
|
$5.11 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $77,068 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $68,903 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Water Disposal Savings | Ancillary Material Cost Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $47,583 | $18,145 |
$68,924
985,053
kWh
|
- |
$(-21,341.0)
-
MMBtu
|
- | - | - | |
02 | 2.4133: Use most efficient type of electric motors | $10,674 | $5,557 |
$8,693
123,974
kWh
|
$1,981
-
kW-mo/yr
|
- | - | - | - | |
03 | 4.652: Replace existing equipment with more suitable substitutes | $4,198 | $1,666 |
$5,810
82,943
kWh
|
$444
-
kW-mo/yr
|
$(-2,056.0)
-
MMBtu
|
- | - | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $3,967 | $650 |
$3,967
81,477
kWh
|
- | - | - | - | - | |
05 | 2.2136: Install / repair insulation on steam lines | $3,067 | $279 | - | - |
$3,067
-
MMBtu
|
- | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $965 | $250 |
$965
13,775
kWh
|
- | - | - | - | - | |
07 | 4.113: Install refrigeration system to cool product | $3,640 | $5,000 | - | - | - | - | $3,640 | - | |
08 | 3.4116: Meter recycled water (to reduce sewer charges) | $2,760 | - | - | - | - |
$2,760
-
Tgal
|
- | - | |
09 | 3.4111: Use closed cycle process to minimize waste water production | $214 | $1,850 |
$(-421.0)
(-6,155)
kWh
|
$(-203.0)
-
kW-mo/yr
|
- |
$641
-
Tgal
|
- |
$197
-
Tgal
|
|
TOTAL RECOMMENDED | $77,068 | $33,397 |
$87,938
1,281,067
kWh
|
$2,222
-
kW-mo/yr
|
$(-20,330.0)
-
MMBtu
|
$3,401
-
Tgal
|
$3,640 |
$197
-
Tgal
|
||
TOTAL IMPLEMENTED | $68,903 | $31,081 |
$78,161
1,116,647
kWh
|
$1,778
-
kW-mo/yr
|
$(-18,274.0)
-
MMBtu
|
$3,401
-
Tgal
|
$3,640 |
$197
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Water Disposal Savings | Ancillary Material Cost Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs