ITAC Assessment: ME0224
ITAC logo
ITAC Assessment: ME0224
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Surface Mount Capacitors
NAICS
n/a
SIC 3675: Electronic Capacitors
Sales Range $10
M
to 50
M
# of Employees 275
Plant Area 73,000
ft2
Annual Production 6,500
pieces
Production Hrs. Annual 6,250
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $392,954 5,822,099
kWh
Electricity Demand $93,585 11,358
kW-mo/yr
Electricity Fees $12,447 -
LPG $267 9
MMBtu
Fuel Oil #2 $64,384 12,601
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $77,068 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $68,903

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Water Disposal Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $47,583 $18,145 $68,924
985,053
kWh
- $(-21,341.0)
-
MMBtu
- - -
02 2.4133: Use most efficient type of electric motors $10,674 $5,557 $8,693
123,974
kWh
$1,981
-
kW-mo/yr
- - - -
03 4.652: Replace existing equipment with more suitable substitutes $4,198 $1,666 $5,810
82,943
kWh
$444
-
kW-mo/yr
$(-2,056.0)
-
MMBtu
- - -
04 2.4221: Install compressor air intakes in coolest locations $3,967 $650 $3,967
81,477
kWh
- - - - -
05 2.2136: Install / repair insulation on steam lines $3,067 $279 - - $3,067
-
MMBtu
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $965 $250 $965
13,775
kWh
- - - - -
07 4.113: Install refrigeration system to cool product $3,640 $5,000 - - - - $3,640 -
08 3.4116: Meter recycled water (to reduce sewer charges) $2,760 - - - - $2,760
-
Tgal
- -
09 3.4111: Use closed cycle process to minimize waste water production $214 $1,850 $(-421.0)
(-6,155)
kWh
$(-203.0)
-
kW-mo/yr
- $641
-
Tgal
- $197
-
Tgal
TOTAL RECOMMENDED $77,068 $33,397 $87,938
1,281,067
kWh
$2,222
-
kW-mo/yr
$(-20,330.0)
-
MMBtu
$3,401
-
Tgal
$3,640 $197
-
Tgal
TOTAL IMPLEMENTED $68,903 $31,081 $78,161
1,116,647
kWh
$1,778
-
kW-mo/yr
$(-18,274.0)
-
MMBtu
$3,401
-
Tgal
$3,640 $197
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Water Disposal Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs