| Assessment Year | 2012 |
|---|---|
| Principal Product | mattresses |
| NAICS | 337910: Mattress Manufacturing |
| SIC | 2515: Mattresses, Foundations, and Convertible Beds |
| Sales Range | $10 M to 50M |
| # of Employees | 56 |
| Plant Area |
110,000
ft2
|
| Annual Production | 120,000
pieces
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $59,457 | 599,900 |
kWh
|
$0.099 |
| Natural Gas | $32,124 | 3,232 |
MMBtu
|
$9.94 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $28,173 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $18,397 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7135: Install occupancy sensors | $930 | $700 |
$930
9,318
kWh
|
- | |
| 02 | 2.4226: Use / purchase optimum sized compressor | $9,776 | $10,060 |
$9,776
97,959
kWh
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,327 | $2,000 |
$7,327
73,416
kWh
|
- | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $2,444 | - |
$2,444
24,485
kWh
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,326 | $16,800 |
$5,326
53,260
kWh
|
- | |
| 06 | 2.1113: Reduce combustion air flow to optimum | $2,370 | $2,270 | - |
$2,370
-
MMBtu
|
|
| TOTAL RECOMMENDED | $28,173 | $31,830 |
$25,803
258,438
kWh
|
$2,370
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $18,397 | $21,770 |
$16,027
160,479
kWh
|
$2,370
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs