ITAC Assessment: UD0518
ITAC logo
ITAC Assessment: UD0518
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Labels & Tags
NAICS
n/a
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range n/a
# of Employees 50
Plant Area 25,000
ft2
Annual Production 144,000,000
thousand feet
Production Hrs. Annual 7,800
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,724 1,415,885
kWh
Electricity Demand $50,958 3,252
kW-mo/yr
Natural Gas $4,586 756
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,228 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (haz) Savings Personnel Changes Savings
01 2.3191: Use demand controller or load shedder $21,625 $250 n/a $21,625
-
kW-mo/yr
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,672 $6,965 n/a $2,672
-
kW-mo/yr
- - - -
03 2.7447: Install vinyl strip / high speed / air curtain doors $2,121 $1,020 n/a - $2,121
-
MMBtu
- - -
04 3.5211: Reuse scrap glass as feed stock $4,800 - n/a - - - $4,800
-
lb
-
05 3.4151: Minimize water usage $15,010 $5,000 n/a - $(-1,070.0)
-
MMBtu
$17,080
-
Tgal
- $(-1,000.0)
TOTAL RECOMMENDED $46,228 $13,235 $24,297
-
kW-mo/yr
$1,051
-
MMBtu
$17,080
-
Tgal
$4,800
-
lb
$(-1,000.0)
TOTAL IMPLEMENTED - - - - - - -