Assessment Year | 1997 |
---|---|
Principal Product | Injection molded plastics |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
55,000
ft2
|
Annual Production | 9,500,000
pieces
|
Production Hrs. Annual | 7,000
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $116,938 | 5,570,047 |
kWh
|
$0.021 |
Electricity Demand | $172,892 | 12,288 |
kW-mo/yr
|
$14.07 |
Electricity Fees | $2,926 | - |
|
- |
Natural Gas | $13,389 | 2,726 |
MMBtu
|
$4.91 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $34,662 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,965 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Solid Waste (haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $2,926 | $5,000 | - |
$2,926
-
kW-mo/yr
|
- | - | |
02 | 3.4114: Replace city water with recycled water via cooling tower | $4,651 | $500 | - | - |
$4,651
-
Tgal
|
- | |
03 | 2.4226: Use / purchase optimum sized compressor | $11,314 | $1,000 |
$6,586
313,599
kWh
|
$4,728
-
kW-mo/yr
|
- | - | |
04 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $3,641 | - | - | - | - |
$3,641
-
lb
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,774 | $33,595 |
$3,722
177,022
kWh
|
$8,052
-
kW-mo/yr
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $356 | $910 |
$119
5,569
kWh
|
$237
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $34,662 | $41,005 |
$10,427
496,190
kWh
|
$15,943
-
kW-mo/yr
|
$4,651
-
Tgal
|
$3,641
-
lb
|
||
TOTAL IMPLEMENTED | $15,965 | $1,500 |
$6,586
313,599
kWh
|
$4,728
-
kW-mo/yr
|
$4,651
-
Tgal
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Solid Waste (haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs