Assessment Year | 1987 |
---|---|
Principal Product | LUNCH MEATS, BACON, HAMS |
NAICS |
n/a
|
SIC | 2013: Sausages and Other Prepared Meat Products |
Sales Range | $10 M to 50M |
# of Employees | 140 |
Plant Area |
n/a
|
Annual Production | 16,000,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $178,969 | 3,577,960 |
kWh
|
$0.050 |
Natural Gas | $69,775 | 16,540 |
MMBtu
|
$4.22 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $24,021 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,885 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2136: Install / repair insulation on steam lines | $12,770 | $2,128 | - |
$12,770
-
MMBtu
|
- | |
02 | 2.2163: Use minimum steam operating pressure | $612 | - | - |
$612
-
MMBtu
|
- | |
03 | 2.4312: Improve lubrication practices | $3,136 | $3,000 |
$3,136
62,720
kWh
|
- | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,136 | $760 |
$3,136
62,720
kWh
|
- | - | |
05 | 2.2511: Insulate bare equipment | $2,271 | $4,080 |
$2,271
45,428
kWh
|
- | - | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $254 | $300 | - |
$554
-
MMBtu
|
$(-300.0) | |
07 | 2.2437: Recover waste heat from equipment | $515 | $800 | - |
$515
-
MMBtu
|
- | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,099 | $150 |
$1,099
21,981
kWh
|
- | - | |
09 | 2.2122: Install / repair insulation on condensate lines | $228 | $72 | - |
$228
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $24,021 | $11,290 |
$9,642
192,849
kWh
|
$14,679
-
MMBtu
|
$(-300.0) | ||
TOTAL IMPLEMENTED | $20,885 | $10,530 |
$6,506
130,129
kWh
|
$14,679
-
MMBtu
|
$(-300.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs