ITAC Assessment: TN0316
ITAC logo
ITAC Assessment: TN0316
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product LUNCH MEATS, BACON, HAMS
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area
n/a
Annual Production 16,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $178,969 3,577,960
kWh
Natural Gas $69,775 16,540
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,021 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,885

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2136: Install / repair insulation on steam lines $12,770 $2,128 - $12,770
-
MMBtu
-
02 2.2163: Use minimum steam operating pressure $612 - - $612
-
MMBtu
-
03 2.4312: Improve lubrication practices $3,136 $3,000 $3,136
62,720
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,136 $760 $3,136
62,720
kWh
- -
05 2.2511: Insulate bare equipment $2,271 $4,080 $2,271
45,428
kWh
- -
06 2.1233: Analyze flue gas for proper air/fuel ratio $254 $300 - $554
-
MMBtu
$(-300.0)
07 2.2437: Recover waste heat from equipment $515 $800 - $515
-
MMBtu
-
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,099 $150 $1,099
21,981
kWh
- -
09 2.2122: Install / repair insulation on condensate lines $228 $72 - $228
-
MMBtu
-
TOTAL RECOMMENDED $24,021 $11,290 $9,642
192,849
kWh
$14,679
-
MMBtu
$(-300.0)
TOTAL IMPLEMENTED $20,885 $10,530 $6,506
130,129
kWh
$14,679
-
MMBtu
$(-300.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs