ITAC Assessment: KG0003
ITAC logo
ITAC Assessment: KG0003
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Integerated circuits
NAICS
n/a
SIC 3674: Semiconductors and Related Devices
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area 44,000
ft2
Annual Production 1,200,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $372,069 6,572,392
kWh
Natural Gas $25,489 5,420
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,162 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,534

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $5,276 $9,920 $5,276
82,649
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,639 $2,314 $4,639
65,064
kWh
03 2.7241: Install outside air damper / economizer on hvac unit $2,257 $2,200 $2,257
82,356
kWh
04 2.2511: Insulate bare equipment $1,863 $100 $1,863
13,775
kWh
05 2.1233: Analyze flue gas for proper air/fuel ratio $1,629 $2,500 $1,629
66,237
kWh
06 2.4221: Install compressor air intakes in coolest locations $126 $155 $126
4,689
kWh
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $372 $1,186 $372
13,775
kWh
TOTAL RECOMMENDED $16,162 $18,375 $16,162
328,545
kWh
TOTAL IMPLEMENTED $9,534 $15,806 $9,534
245,017
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs