ITAC Assessment: UD0506
ITAC logo
ITAC Assessment: UD0506
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product air & hydraulic cylinders
NAICS
n/a
SIC 3594: Fluid Power Pumps and Motors
Sales Range $10
M
to 50
M
# of Employees 191
Plant Area 132,500
ft2
Annual Production 0
units
Production Hrs. Annual 5,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $93,331 3,084,994
kWh
Electricity Demand $101,288 8,364
kW-mo/yr
Natural Gas $28,916 6,092
MMBtu
Fuel Oil #2 $9,900 1,260
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,211 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,211

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.3212: Optimize plant power factor $11,388 $8,000 - $11,388
-
kW-mo/yr
- - -
02 2.4226: Use / purchase optimum sized compressor $1,091 - $718
36,928
kWh
- - - $373
03 2.7142: Utilize higher efficiency lamps and/or ballasts $15,416 $31,170 $5,865
302,462
kWh
$10,332
-
kW-mo/yr
$(-1,616.0)
-
MMBtu
$835 -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $15,316 $41,520 $5,461
281,653
kWh
$9,622
-
kW-mo/yr
- $233 -
TOTAL RECOMMENDED $43,211 $80,690 $12,044
621,043
kWh
$31,342
-
kW-mo/yr
$(-1,616.0)
-
MMBtu
$1,068 $373
TOTAL IMPLEMENTED $43,211 $80,690 $12,044
621,043
kWh
$31,342
-
kW-mo/yr
$(-1,616.0)
-
MMBtu
$1,068 $373
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs