ITAC Assessment: UM0483
ITAC logo
ITAC Assessment: UM0483
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Books
NAICS 323117: Books Printing
SIC 2732: Book Printing
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 84,660
ft2
Annual Production 80,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $202,039 3,190,740
kWh
Natural Gas $37,787 5,498
MMBtu
TOTAL YEARLY COSTS $239,826
RECOMMENDED SAVINGS* $18,446 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,638 $2,500 $2,638
41,879
kWh
-
02 2.4322: Use or replace with energy efficient substitutes $13,305 $5,000 $13,305
211,195
kWh
-
03 2.7135: Install occupancy sensors $860 $1,650 $860
13,658
kWh
-
04 2.2414: Use waste heat from hot flue gases to preheat $1,643 $3,700 - $1,643
-
MMBtu
TOTAL RECOMMENDED $18,446 $12,850 $16,803
266,732
kWh
$1,643
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs