Assessment Year | 1996 |
---|---|
Principal Product | welded steel tubing |
NAICS |
n/a
|
SIC | 3317: Steel Pipe and Tubes |
Sales Range | $10 M to 50M |
# of Employees | 75 |
Plant Area |
209,500
ft2
|
Annual Production | 50,000
thousand feet
|
Production Hrs. Annual | 4,500
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $106,766 | 3,260,844 |
kWh
|
$0.033 |
Electricity Demand | $132,801 | 12,360 |
kW-mo/yr
|
$10.74 |
Natural Gas | $59,203 | 13,293 |
MMBtu
|
$4.45 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $20,718 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,050 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $2,203 | $3,000 | - |
$2,203
-
kW-mo/yr
|
- | - | - | |
02 | 2.4226: Use / purchase optimum sized compressor | $11,117 | $15,000 |
$6,739
206,038
kWh
|
$4,033
-
kW-mo/yr
|
$345
-
MMBtu
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,445 | $10,800 |
$2,249
68,875
kWh
|
$1,936
-
kW-mo/yr
|
- | - | $260 | |
04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $488 | $100 |
$309
9,379
kWh
|
$179
-
kW-mo/yr
|
- | - | - | |
05 | 3.4116: Meter recycled water (to reduce sewer charges) | $1,008 | $400 | - | - | - |
$1,008
-
Tgal
|
- | |
06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,457 | $1,000 |
$662
20,223
kWh
|
$630
-
kW-mo/yr
|
$165
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $20,718 | $30,300 |
$9,959
304,515
kWh
|
$8,981
-
kW-mo/yr
|
$510
-
MMBtu
|
$1,008
-
Tgal
|
$260 | ||
TOTAL IMPLEMENTED | $16,050 | $25,900 |
$9,297
284,292
kWh
|
$6,148
-
kW-mo/yr
|
$345
-
MMBtu
|
- | $260 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs