ITAC Assessment: UD0489
ITAC logo
ITAC Assessment: UD0489
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product welded steel tubing
NAICS
n/a
SIC 3317: Steel Pipe and Tubes
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 209,500
ft2
Annual Production 50,000
thousand feet
Production Hrs. Annual 4,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,766 3,260,844
kWh
Electricity Demand $132,801 12,360
kW-mo/yr
Natural Gas $59,203 13,293
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,718 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,050

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $2,203 $3,000 - $2,203
-
kW-mo/yr
- - -
02 2.4226: Use / purchase optimum sized compressor $11,117 $15,000 $6,739
206,038
kWh
$4,033
-
kW-mo/yr
$345
-
MMBtu
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,445 $10,800 $2,249
68,875
kWh
$1,936
-
kW-mo/yr
- - $260
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $488 $100 $309
9,379
kWh
$179
-
kW-mo/yr
- - -
05 3.4116: Meter recycled water (to reduce sewer charges) $1,008 $400 - - - $1,008
-
Tgal
-
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,457 $1,000 $662
20,223
kWh
$630
-
kW-mo/yr
$165
-
MMBtu
- -
TOTAL RECOMMENDED $20,718 $30,300 $9,959
304,515
kWh
$8,981
-
kW-mo/yr
$510
-
MMBtu
$1,008
-
Tgal
$260
TOTAL IMPLEMENTED $16,050 $25,900 $9,297
284,292
kWh
$6,148
-
kW-mo/yr
$345
-
MMBtu
- $260
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs