Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product UNDERWEAR
NAICS
n/a
SIC 2322: Men's and Boys' Underwear and Nightwear
Sales Range $10
M
to 50
M
# of Employees 430
Plant Area
n/a
Annual Production 12,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $136,907 3,267,585
kWh
LPG $185,438 29,047
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,874 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.6232: Install set-back timers $6,284 - $6,284
235,053
kWh
02 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $4,900 - $4,900
183,177
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,430 - $2,430
90,856
kWh
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,260 $17,250 $1,260
19,050
kWh
TOTAL RECOMMENDED $14,874 $17,250 $14,874
528,136
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs