ITAC Assessment: UD0462
ITAC logo
ITAC Assessment: UD0462
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product 900MHz phones, radar detectors,CDPD modems
NAICS
n/a
SIC 3661: Telephone and Telegraph Apparatus
Sales Range $50
M
to 100
M
# of Employees 506
Plant Area 172,000
ft2
Annual Production 400,000
pieces
Production Hrs. Annual 7,800
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $332,310 6,510,258
kWh
Natural Gas $12,198 2,414
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,796 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,744

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $3,052 $9,500 $3,052
-
kWh
- -
02 2.4226: Use / purchase optimum sized compressor $3,665 $1,500 $3,665
70,926
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $31,569 $16,500 $39,574
913,834
kWh
$(-7,507.0)
-
MMBtu
$(-498.0)
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,510 $2,700 $2,135
47,479
kWh
$(-457.0)
-
MMBtu
$(-168.0)
TOTAL RECOMMENDED $39,796 $30,200 $48,426
1,032,239
kWh
$(-7,964.0)
-
MMBtu
$(-666.0)
TOTAL IMPLEMENTED $36,744 $20,700 $45,374
1,032,239
kWh
$(-7,964.0)
-
MMBtu
$(-666.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs