| Assessment Year | 1995 |
|---|---|
| Principal Product | 900MHz phones, radar detectors,CDPD modems |
| NAICS |
n/a
|
| SIC | 3661: Telephone and Telegraph Apparatus |
| Sales Range | $50 M to 100M |
| # of Employees | 506 |
| Plant Area |
172,000
ft2
|
| Annual Production | 400,000
pieces
|
| Production Hrs. Annual | 7,800
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $332,310 | 6,510,258 |
kWh
|
$0.051 |
| Natural Gas | $12,198 | 2,414 |
MMBtu
|
$5.05 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $39,796 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $36,744 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.3212: Optimize plant power factor | $3,052 | $9,500 |
$3,052
-
kWh
|
- | - | |
| 02 | 2.4226: Use / purchase optimum sized compressor | $3,665 | $1,500 |
$3,665
70,926
kWh
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $31,569 | $16,500 |
$39,574
913,834
kWh
|
$(-7,507.0)
-
MMBtu
|
$(-498.0) | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,510 | $2,700 |
$2,135
47,479
kWh
|
$(-457.0)
-
MMBtu
|
$(-168.0) | |
| TOTAL RECOMMENDED | $39,796 | $30,200 |
$48,426
1,032,239
kWh
|
$(-7,964.0)
-
MMBtu
|
$(-666.0) | ||
| TOTAL IMPLEMENTED | $36,744 | $20,700 |
$45,374
1,032,239
kWh
|
$(-7,964.0)
-
MMBtu
|
$(-666.0) | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs