ITAC Assessment: UD0448
ITAC logo
ITAC Assessment: UD0448
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product dies, tools, jigs
NAICS
n/a
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 90,000
ft2
Annual Production 0
units
Production Hrs. Annual 5,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $79,344 1,136,870
kWh
Natural Gas $7,551 1,474
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,493 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,243

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4226: Use / purchase optimum sized compressor $7,413 $20,000 $7,413
126,612
kWh
- -
02 2.7314: Reduce ventilation air $1,250 $2,500 - $1,250
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,068 $10,425 $4,068
53,927
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,798 $6,200 $1,798
30,774
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,964 $5,270 $1,878
49,238
kWh
- $86
TOTAL RECOMMENDED $16,493 $44,395 $15,157
260,551
kWh
$1,250
-
MMBtu
$86
TOTAL IMPLEMENTED $15,243 $41,895 $15,157
260,551
kWh
- $86
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs