ITAC Assessment: UD0414
ITAC logo
ITAC Assessment: UD0414
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Brazing and Welding Shop
NAICS
n/a
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 95,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,300
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $278,650 5,100,821
kWh
Natural Gas $24,143 5,169
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,027 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,808

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.8123: Pay utility bills on time $2,100 - $2,100
-
kWh
02 2.3191: Use demand controller or load shedder $20,700 $20,000 $20,700
-
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,246 $14,248 $3,246
-
kWh
04 2.6232: Install set-back timers $1,773 $500 $1,773
75,029
kWh
05 2.6232: Install set-back timers $1,689 $1,500 $1,689
19,930
kWh
06 2.3191: Use demand controller or load shedder $3,519 - $3,519
-
kWh
TOTAL RECOMMENDED $33,027 $36,248 $33,027
94,959
kWh
TOTAL IMPLEMENTED $8,808 $16,248 $8,808
94,959
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs