ITAC Assessment: UD0404
ITAC logo
ITAC Assessment: UD0404
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product concession equipment
NAICS
n/a
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 210
Plant Area 200,000
ft2
Annual Production 15,000
pieces
Production Hrs. Annual 2,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $102,995 1,629,250
kWh
Natural Gas $18,617 3,938
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,651 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,457

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4224: Upgrade controls on compressors $750 $200 $750
24,912
kWh
-
02 2.4224: Upgrade controls on compressors $875 $200 $875
29,308
kWh
-
03 2.1212: Operate boilers on high fire setting $795 $200 - $795
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $9,030 $28,125 $9,030
126,905
kWh
-
05 2.7261: Install timers and/or thermostats $3,865 $1,200 $655
9,965
kWh
$3,210
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $142 $96 $142
2,052
kWh
-
07 2.7131: Add area lighting switches $1,194 $600 $1,194
12,896
kWh
-
TOTAL RECOMMENDED $16,651 $30,621 $12,646
206,038
kWh
$4,005
-
MMBtu
TOTAL IMPLEMENTED $15,457 $30,021 $11,452
193,142
kWh
$4,005
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs