| Assessment Year | 1993 |
|---|---|
| Principal Product | concession equipment |
| NAICS |
n/a
|
| SIC | 3999: Manufacturing Industries, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 210 |
| Plant Area |
200,000
ft2
|
| Annual Production | 15,000
pieces
|
| Production Hrs. Annual | 2,500
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $102,995 | 1,629,250 |
kWh
|
$0.063 |
| Natural Gas | $18,617 | 3,938 |
MMBtu
|
$4.73 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $16,651 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $15,457 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4224: Upgrade controls on compressors | $750 | $200 |
$750
24,912
kWh
|
- | |
| 02 | 2.4224: Upgrade controls on compressors | $875 | $200 |
$875
29,308
kWh
|
- | |
| 03 | 2.1212: Operate boilers on high fire setting | $795 | $200 | - |
$795
-
MMBtu
|
|
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,030 | $28,125 |
$9,030
126,905
kWh
|
- | |
| 05 | 2.7261: Install timers and/or thermostats | $3,865 | $1,200 |
$655
9,965
kWh
|
$3,210
-
MMBtu
|
|
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $142 | $96 |
$142
2,052
kWh
|
- | |
| 07 | 2.7131: Add area lighting switches | $1,194 | $600 |
$1,194
12,896
kWh
|
- | |
| TOTAL RECOMMENDED | $16,651 | $30,621 |
$12,646
206,038
kWh
|
$4,005
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $15,457 | $30,021 |
$11,452
193,142
kWh
|
$4,005
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs