Assessment Year | 1993 |
---|---|
Principal Product | concession equipment |
NAICS |
n/a
|
SIC | 3999: Manufacturing Industries, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 210 |
Plant Area |
200,000
ft2
|
Annual Production | 15,000
pieces
|
Production Hrs. Annual | 2,500
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $102,995 | 1,629,250 |
kWh
|
$0.063 |
Natural Gas | $18,617 | 3,938 |
MMBtu
|
$4.73 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,651 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,457 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4224: Upgrade controls on compressors | $750 | $200 |
$750
24,912
kWh
|
- | |
02 | 2.4224: Upgrade controls on compressors | $875 | $200 |
$875
29,308
kWh
|
- | |
03 | 2.1212: Operate boilers on high fire setting | $795 | $200 | - |
$795
-
MMBtu
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,030 | $28,125 |
$9,030
126,905
kWh
|
- | |
05 | 2.7261: Install timers and/or thermostats | $3,865 | $1,200 |
$655
9,965
kWh
|
$3,210
-
MMBtu
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $142 | $96 |
$142
2,052
kWh
|
- | |
07 | 2.7131: Add area lighting switches | $1,194 | $600 |
$1,194
12,896
kWh
|
- | |
TOTAL RECOMMENDED | $16,651 | $30,621 |
$12,646
206,038
kWh
|
$4,005
-
MMBtu
|
||
TOTAL IMPLEMENTED | $15,457 | $30,021 |
$11,452
193,142
kWh
|
$4,005
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs