ITAC Assessment: UD0402
ITAC logo
ITAC Assessment: UD0402
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product printed circuit boards
NAICS
n/a
SIC 3672: Printed Circuit Boards
Sales Range $10
M
to 50
M
# of Employees 112
Plant Area 56,000
ft2
Annual Production 10,900,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $199,710 4,284,584
kWh
Natural Gas $28,188 7,316
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,389 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,825

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $10,502 - $10,502
-
kWh
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,564 - $2,564
-
kWh
-
03 2.6218: Turn off equipment when not in use $1,064 - - $1,064
-
MMBtu
04 2.2437: Recover waste heat from equipment $4,680 $1,500 - $4,680
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $12,502 $25,812 $12,502
221,278
kWh
-
06 2.3191: Use demand controller or load shedder $5,782 $15,000 $5,782
-
kWh
-
07 2.7261: Install timers and/or thermostats $2,295 $1,350 $353
16,413
kWh
$1,942
-
MMBtu
TOTAL RECOMMENDED $39,389 $43,662 $31,703
237,691
kWh
$7,686
-
MMBtu
TOTAL IMPLEMENTED $36,825 $43,662 $29,139
237,691
kWh
$7,686
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs