ITAC Assessment: MA0257
ITAC logo
ITAC Assessment: MA0257
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product BRASSIERES, GIRDLES
NAICS
n/a
SIC 2342: Brassieres, Girdles, and Allied Garments
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,116
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,418 593,200
kWh
Natural Gas $59,378 8,083
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,630 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,007

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $10,912 - - $10,912
-
MMBtu
-
02 2.7224: Reduce space conditioning during non-working hours $6,086 $7,950 - $6,086
-
MMBtu
-
03 2.6232: Install set-back timers $5,224 $800 $5,224
42,790
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $783 $1 $1,006
8,206
kWh
- $(-223.0)
05 2.1213: Direct warmest air to combustion intake $625 $2,169 - $625
-
MMBtu
-
TOTAL RECOMMENDED $23,630 $10,920 $6,230
50,996
kWh
$17,623
-
MMBtu
$(-223.0)
TOTAL IMPLEMENTED $6,007 $801 $6,230
50,996
kWh
- $(-223.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs