ITAC Assessment: UD0400
ITAC logo
ITAC Assessment: UD0400
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product electroplating
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $5
M
to 10
M
# of Employees 68
Plant Area 50,000
ft2
Annual Production 19,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $180,399 3,126,612
kWh
Natural Gas $107,635 25,027
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,952 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,952

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $9,689 $29,000 $13,716
132,181
kWh
$(-4,027.0)
-
MMBtu
02 2.4224: Upgrade controls on compressors $7,173 - $7,173
-
kWh
-
03 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $5,233 $12,000 - $5,233
-
MMBtu
04 2.7134: Use photocell controls $1,233 $1,000 $1,233
29,308
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,925 $4,282 $1,925
36,635
kWh
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $1,699 $250 - $1,699
-
MMBtu
TOTAL RECOMMENDED $26,952 $46,532 $24,047
198,124
kWh
$2,905
-
MMBtu
TOTAL IMPLEMENTED $26,952 $46,532 $24,047
198,124
kWh
$2,905
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs