ITAC Assessment: UD0398
ITAC logo
ITAC Assessment: UD0398
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product weatherstripping, moldings, weatherseals
NAICS
n/a
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 320
Plant Area 192,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $331,616 6,519,930
kWh
Natural Gas $10,630 2,628
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,774 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,718

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Energy Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $16,277 - $16,277
-
kWh
- -
02 2.5123: Reduce fluid flow rates $7,396 $5,000 $(-1,410.0)
(-29,894)
kWh
- $8,806
-
MMBtu
03 2.2437: Recover waste heat from equipment $12,240 $40,000 - $12,240
-
MMBtu
-
04 2.7111: Reduce illumination to minimum necessary levels $156 $200 $334
15,533
kWh
$(-178.0)
-
MMBtu
-
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $6,539 - $6,539
63,013
kWh
- -
06 2.4224: Upgrade controls on compressors $5,166 $800 $6,665
155,041
kWh
$(-1,499.0)
-
MMBtu
-
TOTAL RECOMMENDED $47,774 $46,000 $28,405
203,693
kWh
$10,563
-
MMBtu
$8,806
-
MMBtu
TOTAL IMPLEMENTED $12,718 $6,000 $5,589
140,680
kWh
$(-1,677.0)
-
MMBtu
$8,806
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Energy Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs