ITAC Assessment: UD0397
ITAC logo
ITAC Assessment: UD0397
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product aerospace composite hardware
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 92,500
ft2
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $107,345 1,943,728
kWh
Natural Gas $56,894 12,424
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,745 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,745

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.8112: Combine utility meters $838 $200 - $838
-
MMBtu
02 2.4226: Use / purchase optimum sized compressor $4,462 $100 $4,462
208,675
kWh
-
03 2.7111: Reduce illumination to minimum necessary levels $445 $20 $549
11,723
kWh
$(-104.0)
-
MMBtu
TOTAL RECOMMENDED $5,745 $320 $5,011
220,398
kWh
$734
-
MMBtu
TOTAL IMPLEMENTED $5,745 $320 $5,011
220,398
kWh
$734
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs