ITAC Assessment: UD0395
ITAC logo
ITAC Assessment: UD0395
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product industrial valves
NAICS
n/a
SIC 3494: Valves and Pipe Fittings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 120,000
ft2
Annual Production 8,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $202,866 3,102,286
kWh
Natural Gas $82,056 18,528
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,523 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,870

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,009 $2,080 $2,900
41,618
kWh
$(-891.0)
-
MMBtu
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,656 $10,000 $4,957
57,444
kWh
$(-2,301.0)
-
MMBtu
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $7,731 - $7,731
-
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,051 $8,096 $3,390
50,703
kWh
$(-339.0)
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $6,997 $48,174 $8,163
122,216
kWh
$(-1,166.0)
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,516 $1,200 $2,516
56,272
kWh
-
07 2.7447: Install vinyl strip / high speed / air curtain doors $11,563 $10,625 - $11,563
-
MMBtu
TOTAL RECOMMENDED $36,523 $80,175 $29,657
328,253
kWh
$6,866
-
MMBtu
TOTAL IMPLEMENTED $26,870 $22,001 $16,537
148,593
kWh
$10,333
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs