Assessment Year | 1994 |
---|---|
Principal Product | industrial valves |
NAICS |
n/a
|
SIC | 3494: Valves and Pipe Fittings, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
120,000
ft2
|
Annual Production | 8,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $202,866 | 3,102,286 |
kWh
|
$0.065 |
Natural Gas | $82,056 | 18,528 |
MMBtu
|
$4.43 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $36,523 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $26,870 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $2,009 | $2,080 |
$2,900
41,618
kWh
|
$(-891.0)
-
MMBtu
|
|
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $2,656 | $10,000 |
$4,957
57,444
kWh
|
$(-2,301.0)
-
MMBtu
|
|
03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $7,731 | - |
$7,731
-
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,051 | $8,096 |
$3,390
50,703
kWh
|
$(-339.0)
-
MMBtu
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,997 | $48,174 |
$8,163
122,216
kWh
|
$(-1,166.0)
-
MMBtu
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,516 | $1,200 |
$2,516
56,272
kWh
|
- | |
07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $11,563 | $10,625 | - |
$11,563
-
MMBtu
|
|
TOTAL RECOMMENDED | $36,523 | $80,175 |
$29,657
328,253
kWh
|
$6,866
-
MMBtu
|
||
TOTAL IMPLEMENTED | $26,870 | $22,001 |
$16,537
148,593
kWh
|
$10,333
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |