ITAC Assessment: TN0122
ITAC logo
ITAC Assessment: TN0122
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product SOLID-FUEL HEATERS
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range n/a
# of Employees 400
Plant Area
n/a
Annual Production 65,000
pieces
Production Hrs. Annual 0
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,774 1,620,164
kWh
Natural Gas $96,211 31,221
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,204 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2211: Use optimum temperature $1,593 - - $1,593
-
MMBtu
02 2.2514: Cover open tanks $467 $900 - $467
-
MMBtu
03 2.7141: Lower light fixtures in high ceiling areas $663 $800 $663
14,947
kWh
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $481 $82 - $481
-
MMBtu
TOTAL RECOMMENDED $3,204 $1,782 $663
14,947
kWh
$2,541
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs