ITAC Assessment: UD0362
ITAC logo
ITAC Assessment: UD0362
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product SCREENING/SIFTING EQUIPMENT
NAICS
n/a
SIC 3569: General Industrial Machinery and Equipment, Not Elsewhere
Sales Range $10
M
to 50
M
# of Employees 117
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,250
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $132,445 2,097,597
kWh
Fuel Oil #2 $11,475 1,890
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,982 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,452

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $500 $1,500 $500
-
kWh
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $810 - $810
-
kWh
-
03 2.6232: Install set-back timers $952 - $1,110
14,361
kWh
$(-158.0)
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,720 $8,620 $4,290
55,686
kWh
$(-570.0)
-
MMBtu
TOTAL RECOMMENDED $5,982 $10,120 $6,710
70,047
kWh
$(-728.0)
-
MMBtu
TOTAL IMPLEMENTED $1,452 $1,500 $1,610
14,361
kWh
$(-158.0)
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs