ITAC Assessment: UD0357
ITAC logo
ITAC Assessment: UD0357
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product MOPS, BROOMS, BRUSHES
NAICS
n/a
SIC 3991: Brooms and Brushes
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $160,564 1,665,006
kWh
Natural Gas $28,485 5,921
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,873 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,873

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,022 - $1,322
-
kWh
- $(-300.0)
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $8,700 - $8,813
-
kWh
- $(-113.0)
03 2.7142: Utilize higher efficiency lamps and/or ballasts $729 - $519
7,034
kWh
- $210
04 2.4221: Install compressor air intakes in coolest locations $228 $500 $228
9,672
kWh
- -
05 2.2437: Recover waste heat from equipment $194 $1,000 - $194
-
MMBtu
-
TOTAL RECOMMENDED $10,873 $1,500 $10,882
16,706
kWh
$194
-
MMBtu
$(-203.0)
TOTAL IMPLEMENTED $10,873 $1,500 $10,882
16,706
kWh
$194
-
MMBtu
$(-203.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs