ITAC Assessment: UD0354
ITAC logo
ITAC Assessment: UD0354
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product STEEL WOOLS
NAICS
n/a
SIC 3291: Abrasive Products
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area
n/a
Annual Production 7,500
ton
Production Hrs. Annual 5,760
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $518,269 6,560,375
kWh
Natural Gas $65,650 13,478
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,273 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,273

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $12,118 $4,375 $12,118
-
kWh
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $10,516 - $11,016
-
kWh
$(-500.0)
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $21,096 - $22,032
-
kWh
$(-936.0)
04 2.6232: Install set-back timers $3,907 - $3,389
54,807
kWh
$518
05 2.6232: Install set-back timers $1,636 - $1,426
23,154
kWh
$210
TOTAL RECOMMENDED $49,273 $4,375 $49,981
77,961
kWh
$(-708.0)
TOTAL IMPLEMENTED $49,273 $4,375 $49,981
77,961
kWh
$(-708.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs