Assessment Year | 2023 |
---|---|
Principal Product | Packaging Machinery |
NAICS | 333993: Packaging Machinery Manufacturing |
SIC | 3565: Packaging Machinery |
Sales Range | $50 M to 100M |
# of Employees | 300 |
Plant Area |
225,000
ft2
|
Annual Production | 181
units
|
Production Hrs. Annual | 4,584
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $214,163 | 3,873,216 |
kWh
|
$0.055 |
Electricity Demand | $111,865 | 8,399 |
kW-mo/yr
|
$13.32 |
Electricity Fees | $29,569 | - |
|
- |
Natural Gas | $68,224 | 8,731 |
MMBtu
|
$7.81 |
TOTAL YEARLY COSTS | $423,821 | |||
RECOMMENDED SAVINGS* | $249,339 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $30,743 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.6212: Turn off equipment during breaks, reduce operating time | $6,461 | - |
$6,461
121,909
kWh
|
- | - | - | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,689 | $325 |
$2,774
50,170
kWh
|
$915
-
kW-mo/yr
|
- | - | - | |
03 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,083 | - |
$1,083
19,586
kWh
|
- | - | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $703 | - |
$431
7,799
kWh
|
$272
-
kW-mo/yr
|
- | - | - | |
05 | 2.3511: Use plant owned transformers or lease transformers | $106,038 | $57,050 | - | - | $106,038 | - | - | |
06 | 2.8114: Change rate schedules or other changes in utility service | $18,807 | - | - | - | - | - | $18,807 | |
07 | 2.7135: Install occupancy sensors | $14,358 | $18,834 |
$7,577
137,011
kWh
|
$4,777
-
kW-mo/yr
|
- | - | $2,004 | |
08 | 2.7111: Reduce illumination to minimum necessary levels | $33,383 | $25,920 |
$17,741
320,807
kWh
|
$11,186
-
kW-mo/yr
|
- | - | $4,456 | |
09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $59,158 | $92,100 |
$44,481
804,366
kWh
|
$14,677
-
kW-mo/yr
|
- | - | - | |
10 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $969 | $3,439 |
$594
10,746
kWh
|
$375
-
kW-mo/yr
|
- | - | - | |
11 | 2.2414: Use waste heat from hot flue gases to preheat | $4,057 | $18,480 | - | - | - |
$4,057
-
MMBtu
|
- | |
12 | 2.1233: Analyze flue gas for proper air/fuel ratio | $633 | $80 | - | - | - |
$633
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $249,339 | $216,228 |
$81,142
1,472,394
kWh
|
$32,202
-
kW-mo/yr
|
$106,038 |
$4,690
-
MMBtu
|
$25,267 | ||
TOTAL IMPLEMENTED | $30,743 | $325 |
$10,749
199,464
kWh
|
$1,187
-
kW-mo/yr
|
- | - | $18,807 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs