ITAC Assessment: UD0337
ITAC logo
ITAC Assessment: UD0337
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product ELECTRIC WELDED TUBING
NAICS
n/a
SIC 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills
Sales Range $50
M
to 100
M
# of Employees 390
Plant Area
n/a
Annual Production 120
thousand feet
Production Hrs. Annual 5,800
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $536,085 10,038,394
kWh
Natural Gas $313,886 80,012
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $158,917 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3511: Use plant owned transformers or lease transformers $69,034 - $74,034
-
kWh
- $(-5,000.0)
02 2.2491: Use cooling air which cools hot work pieces for space heating $37,108 $90,000 - $37,108
-
MMBtu
-
03 2.2511: Insulate bare equipment $3,239 $2,700 - $3,239
-
MMBtu
-
04 2.7111: Reduce illumination to minimum necessary levels $2,619 - $2,980
64,185
kWh
$(-676.0)
-
MMBtu
$315
05 2.6232: Install set-back timers $1,077 - $1,391
46,307
kWh
$(-489.0)
-
MMBtu
$175
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $45,840 - $51,840
-
kWh
- $(-6,000.0)
TOTAL RECOMMENDED $158,917 $92,700 $130,245
110,492
kWh
$39,182
-
MMBtu
$(-10,510.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs