ITAC Assessment: UD0330
ITAC logo
ITAC Assessment: UD0330
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product AUTO PACKAGING MACHINES
NAICS
n/a
SIC 3569: General Industrial Machinery and Equipment, Not Elsewhere
Sales Range $50
M
to 100
M
# of Employees 510
Plant Area
n/a
Annual Production 120
pieces
Production Hrs. Annual 5,000
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $328,301 6,452,228
kWh
Natural Gas $59,146 12,790
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,037 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,017

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7221: Lower temperature during the winter season and vice-versa $1,879 - $1,879
36,049
kWh
- -
02 3.4115: Recover and reuse cooling water $8,744 $10,000 $474
9,672
kWh
- $8,270
03 2.2437: Recover waste heat from equipment $8,017 $15,000 - $1,087
-
MMBtu
$6,930
04 2.7111: Reduce illumination to minimum necessary levels $3,681 $500 $3,758
75,909
kWh
$(-493.0)
-
MMBtu
$416
05 2.6232: Install set-back timers $5,716 $1,500 $6,389
214,537
kWh
$(-1,393.0)
-
MMBtu
$720
TOTAL RECOMMENDED $28,037 $27,000 $12,500
336,167
kWh
$(-799.0)
-
MMBtu
$16,336
TOTAL IMPLEMENTED $8,017 $15,000 - $1,087
-
MMBtu
$6,930
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs