Assessment Year | 1990 |
---|---|
Principal Product | TITANIUM ALLOY AIR FOILS |
NAICS |
n/a
|
SIC | 3463: Nonferrous Forgings |
Sales Range | $10 M to 50M |
# of Employees | 157 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 4,900
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $466,519 | 12,992,380 |
kWh
|
$0.036 |
Natural Gas | $218,893 | 75,842 |
MMBtu
|
$2.89 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $64,924 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $62,899 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $14,606 | $12,000 |
$14,606
104,045
kWh
|
- | - | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $49,772 | $3,000 |
$50,972
(-38,101)
kWh
|
- | $(-1,200.0) | |
03 | 2.2444: Use hot process fluids to preheat incoming process fluids | $1,063 | $1,000 | - |
$1,063
-
MMBtu
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $(-1,479.0) | $540 |
$381
8,206
kWh
|
- | $(-1,860.0) | |
05 | 2.7261: Install timers and/or thermostats | $962 | $600 |
$106
11,430
kWh
|
$856
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $64,924 | $17,140 |
$66,065
85,580
kWh
|
$1,919
-
MMBtu
|
$(-3,060.0) | ||
TOTAL IMPLEMENTED | $62,899 | $15,540 |
$65,959
74,150
kWh
|
- | $(-3,060.0) |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs