ITAC Assessment: UD0327
ITAC logo
ITAC Assessment: UD0327
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product TITANIUM ALLOY AIR FOILS
NAICS
n/a
SIC 3463: Nonferrous Forgings
Sales Range $10
M
to 50
M
# of Employees 157
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,900
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $466,519 12,992,380
kWh
Natural Gas $218,893 75,842
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $64,924 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $62,899

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $14,606 $12,000 $14,606
104,045
kWh
- -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $49,772 $3,000 $50,972
(-38,101)
kWh
- $(-1,200.0)
03 2.2444: Use hot process fluids to preheat incoming process fluids $1,063 $1,000 - $1,063
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $(-1,479.0) $540 $381
8,206
kWh
- $(-1,860.0)
05 2.7261: Install timers and/or thermostats $962 $600 $106
11,430
kWh
$856
-
MMBtu
-
TOTAL RECOMMENDED $64,924 $17,140 $66,065
85,580
kWh
$1,919
-
MMBtu
$(-3,060.0)
TOTAL IMPLEMENTED $62,899 $15,540 $65,959
74,150
kWh
- $(-3,060.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs