Assessment Year | 1990 |
---|---|
Principal Product | VINYL WALL COVERINGS |
NAICS |
n/a
|
SIC | 2295: Coated Fabrics, Not Rubberized |
Sales Range | $50 M to 100M |
# of Employees | 514 |
Plant Area |
n/a
|
Annual Production | 127,790,000
thousand feet
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,230,754 | 27,560,376 |
kWh
|
$0.045 |
Coal | $734,240 | 440,538 |
MMBtu
|
$1.67 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $305,096 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $42,716 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Coal Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,153 | $2,400 |
$708
17,878
kWh
|
$(-92.0)
-
MMBtu
|
$537 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,262 | $7,825 |
$4,604
116,940
kWh
|
$(-612.0)
-
MMBtu
|
$270 | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,422 | $2,000 |
$2,502
63,599
kWh
|
- | $920 | |
04 | 2.3212: Optimize plant power factor | $157,000 | $220,000 |
$157,000
-
kWh
|
- | - | |
05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $18,569 | - |
$20,569
-
kWh
|
- | $(-2,000.0) | |
06 | 2.2441: Preheat boiler makeup water with waste process heat | $8,884 | - |
$5,000
111,958
kWh
|
$3,344
-
MMBtu
|
$540 | |
07 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $6,775 | $5,000 |
$6,775
213,951
kWh
|
- | - | |
08 | 2.7261: Install timers and/or thermostats | $21,868 | $12,000 | - |
$21,868
-
MMBtu
|
- | |
09 | 2.2135: Repair and eliminate steam leaks | $24,995 | - | - |
$11,308
-
MMBtu
|
$13,687 | |
10 | 2.2414: Use waste heat from hot flue gases to preheat | $58,168 | $100,000 | - |
$58,168
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $305,096 | $349,225 |
$197,158
524,326
kWh
|
$93,984
-
MMBtu
|
$13,954 | ||
TOTAL IMPLEMENTED | $42,716 | $12,225 |
$12,814
310,375
kWh
|
$13,948
-
MMBtu
|
$15,954 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Coal Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs