| Assessment Year | 1989 |
|---|---|
| Principal Product | ELECTRONIC AIR CLEANERS |
| NAICS |
n/a
|
| SIC | 3443: Fabricated Plate Work (Boiler Shops) |
| Sales Range | $10 M to 50M |
| # of Employees | 250 |
| Plant Area |
n/a
|
| Annual Production | 16,200
pieces
|
| Production Hrs. Annual | 5,500
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $114,911 | 1,964,244 |
kWh
|
$0.059 |
| Natural Gas | $18,163 | 4,070 |
MMBtu
|
$4.46 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $19,057 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.3212: Optimize plant power factor | $3,681 | $6,000 |
$3,681
-
kWh
|
- | - | |
| 02 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $1,994 | $3,000 |
$2,280
89,683
kWh
|
$(-686.0)
-
MMBtu
|
$400 | |
| 03 | 2.2437: Recover waste heat from equipment | $2,064 | $4,000 | - |
$2,064
-
MMBtu
|
- | |
| 04 | 2.6232: Install set-back timers | $3,650 | - |
$3,676
144,783
kWh
|
$(-1,106.0)
-
MMBtu
|
$1,080 | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,668 | $100 |
$8,199
182,298
kWh
|
$(-1,391.0)
-
MMBtu
|
$860 | |
| TOTAL RECOMMENDED | $19,057 | $13,100 |
$17,836
416,764
kWh
|
$(-1,119.0)
-
MMBtu
|
$2,340 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs