ITAC Assessment: UD0306
ITAC logo
ITAC Assessment: UD0306
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product ELECTRONIC AIR CLEANERS
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 16,200
pieces
Production Hrs. Annual 5,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $114,911 1,964,244
kWh
Natural Gas $18,163 4,070
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,057 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $3,681 $6,000 $3,681
-
kWh
- -
02 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $1,994 $3,000 $2,280
89,683
kWh
$(-686.0)
-
MMBtu
$400
03 2.2437: Recover waste heat from equipment $2,064 $4,000 - $2,064
-
MMBtu
-
04 2.6232: Install set-back timers $3,650 - $3,676
144,783
kWh
$(-1,106.0)
-
MMBtu
$1,080
05 2.7142: Utilize higher efficiency lamps and/or ballasts $7,668 $100 $8,199
182,298
kWh
$(-1,391.0)
-
MMBtu
$860
TOTAL RECOMMENDED $19,057 $13,100 $17,836
416,764
kWh
$(-1,119.0)
-
MMBtu
$2,340
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs