| Assessment Year | 1989 |
|---|---|
| Principal Product | UNDERWATER PELLETIZERS |
| NAICS |
n/a
|
| SIC | 3423: Hand and Edge Tools, Except Machine Tools and Handsaws |
| Sales Range | $5 M to 10M |
| # of Employees | 56 |
| Plant Area |
n/a
|
| Annual Production | 4,000,000
pieces
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $91,181 | 1,427,902 |
kWh
|
$0.064 |
| Natural Gas | $24,202 | 5,705 |
MMBtu
|
$4.24 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $12,098 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,998 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $2,135 | - |
$2,135
87,632
kWh
|
- | - | |
| 02 | 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads | $4,863 | $4,000 |
$4,863
-
kWh
|
- | - | |
| 03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,311 | - |
$1,311
-
kWh
|
- | - | |
| 04 | 2.6232: Install set-back timers | $795 | - |
$840
17,878
kWh
|
$(-110.0)
-
MMBtu
|
$65 | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $357 | $700 |
$411
8,792
kWh
|
$(-54.0)
-
MMBtu
|
- | |
| 06 | 2.2414: Use waste heat from hot flue gases to preheat | $2,637 | $7,500 | - |
$2,637
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $12,098 | $12,200 |
$9,560
114,302
kWh
|
$2,473
-
MMBtu
|
$65 | ||
| TOTAL IMPLEMENTED | $6,998 | $4,000 |
$6,998
87,632
kWh
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs