ITAC Assessment: UD0300
ITAC logo
ITAC Assessment: UD0300
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product VALVES & PIPE FITTINGS
NAICS
n/a
SIC 3494: Valves and Pipe Fittings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 215
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $236,915 5,576,495
kWh
Natural Gas $105,430 31,559
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,949 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,801

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,966 - $4,116
-
kWh
- $(-150.0)
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,322 - $4,322
-
kWh
- $(-1,000.0)
03 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $14,860 $25,000 $7,574
235,346
kWh
- $7,286
04 2.6232: Install set-back timers $3,801 - $3,696
123,095
kWh
$(-445.0)
-
MMBtu
$550
TOTAL RECOMMENDED $25,949 $25,000 $19,708
358,441
kWh
$(-445.0)
-
MMBtu
$6,686
TOTAL IMPLEMENTED $3,801 - $3,696
123,095
kWh
$(-445.0)
-
MMBtu
$550
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs